Draft Annual Plan 1983-84 Volume IV General Areas Government of Assam

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Planning Commission

Abstract

The level of development achieved up to the base year 1979-80 was 3304 KM surfaced, and 15980 KM unsurfaced, totaling 19284 KM. The actual achievement during 1980-81 is 135 KM surfaced,564 KM unsurfaced, totaling 699 KM. The achievement during 1981-82 is 84 KM surfaced 510 KM unsurfaced totaling 594 KM.

Description

Keywords

Citation

Planning Commission - 1983

Collections

Endorsement

Review

Supplemented By

Referenced By