Draft Annual Plan 1989-90 Guide Lines Uttar Pradesh

dc.contributor.authorPlanning Commission
dc.date.accessioned2023-11-24T07:45:17Z
dc.date.available2023-11-24T07:45:17Z
dc.date.issued1988-12
dc.description.abstractThe project envisages construction of a 716 M. long barrage on river Ghaghra at Katerniaghat about 10 km. below Indo-Nepal border and another barrage 408 M long on river Sarda both linked by a link canal. the available discharge of river Ghaghra and Sharda will be conveyed through a feeder canal to different branches of Sarda Canal system for intensifying irrigation thereon and taking up new areas. the project estimated to cost Rs.73,323 lakh will provide irrigation benefits to about 15.82 lakh hectares in Allahabad, Varanasi, Kheri, Sitapur, Lucknow, Bara Banki, Ghazipur, Rae Bareli, Sultanpur, Jaunpur, Azamgarh, Pratapgarh, Farrukhabad and Ballia Districts.
dc.identifier.citationPlanning Commission - 1988-12
dc.identifier.issnC702
dc.identifier.urihttp://10.21.131.211/handle/123456789/1023
dc.identifier.urihttp://10.21.131.211:8080/eBook/C702/index.html
dc.language.isoen
dc.publisherPlanning Commission
dc.relation.ispartofseriesD-4-998-C-697
dc.titleDraft Annual Plan 1989-90 Guide Lines Uttar Pradesh
dc.title.alternativeGovernment of Uttar Pradesh, Planning Department
dc.typeBook

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Draft_Annual_Plan_1989-90_Guide_Lines.pdf
Size:
41.01 MB
Format:
Adobe Portable Document Format

Collections