Draft Annual Plan 1990-91 Volume-II(B) Government of Arunachal Pradesh

dc.contributor.authorPlanning Commission
dc.date.accessioned2025-11-11T10:34:28Z
dc.date.available2025-11-11T10:34:28Z
dc.date.issued1990
dc.descriptionGovernment of Arunachal Pradesh Planning and Development Department Itanagar
dc.description.abstractThe North Eastern Region is end owned with large amount/ of Hydroelectric potential as assessed by the Central Electricity Authority. The detailed power studies are required to be conducted and whole integrated plans prepared to tap the huge hydro-electric potential. The accelerated hydel development is also extremely important from various national considerations, such as environmental hazards, conservation of deplete able fossil fuels, reduction in overall electricity generation costs. In view of this, there is a need to take firm action for taking up the investigation of various hydro-electric projects as well tapping of small and big hyd.ro electric projects in Arunachal Pradesh. Arunachal Pradesh have already, though completed 24 Micro Hydel Schemes; in isolated manner, which are too insufficient to meet the growing demand. The demand is being supplemented by the diesel generation for which efforts are being tried to reduce gradually by import of power from Assam. During 8th Five Year Plan, more emphasis is given from hydel power generation and its transmission. Arunachal Pradesh is also having sufficient natural gas yield in the Eastern rector. Installing, a gas turbine is considered a viable project for enhancing the power generation and provision is being proposed in the Annual Plan.
dc.identifier.citationPlanning Commission - 1990
dc.identifier.issnC407
dc.identifier.urihttp://10.21.131.211:4000/handle/123456789/5706
dc.identifier.urihttp://10.21.131.211:8080/eBook/C407/index.html
dc.language.isoen
dc.publisherPlanning Commission
dc.relation.ispartofseriesC-5700
dc.subjectPower
dc.subjectHousing
dc.subjectUrban Development
dc.subjectWater Supply (Admin centers)
dc.subjectMedium Irrigation and Flood control
dc.subjectHydel Generation
dc.subjectDiesel Generation
dc.subjectTransmission & Distribution
dc.subjectRural Electrification
dc.subjectBorder villages electrifications under State Plan
dc.subjectSurvey & Investigation under NEC
dc.subjectEstablishment
dc.titleDraft Annual Plan 1990-91 Volume-II(B) Government of Arunachal Pradesh
dc.title.alternativeGovernment of Arunachal Pradesh
dc.typeReport

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Draft_Annual_Plan_1990-91_Volume-II(B)_Government_Arunachal_Pradesh.pdf
Size:
27.83 MB
Format:
Adobe Portable Document Format

Collections